Monday, March 14, 2016

more bathroom remodeling and a little man becoming a young man

So the bathroom remodel comtinues- I feel like it is never going to end.  The guys were here working on Wednesday, Thursday and Friday and are still not done.  Thursday was only 2 hours of work because of the power going off in our area in the afternoon.   UGHHHHH. 
By Friday, I was starting to think about pain colors since I will have to repaint half the bathroom.  the first 4 color choices were these.  I quickly eliminated the purple ones. 

Then little man and I tried 2 pale blues- these are 2 different colors.  I like the top one.

Finally, Saturday, while little man was at a scouting event, I bought 4 more colors.  Of these, the one in the top left hand corner is the one he and I like the best.  Today, I realized I have to paint the ceiling too, so the light blue is going on the ceiling and the lighter teal/turquoise color is going on the walls.  It is going to be a very tropical looking bathroom.  All of the Yellow will be covered up.

This is the shower on Friday- green board up (water proof) and the backing boards for the shower walls up.

Some mudding on Friday (to seal the seams).  this is where Chris stopped on Friday.  Today he is back doing more mudding- see pictures further down this post.


Saturday night, my friend had her 50th birthday party. L (who turns 50 next year), F (her birthday celebration) and me.  I did not realize how I looked with my hair pulled back in a pony tail- I guess that look is out.

Sunday was the cub scout Blue and Gold banquet.  With the changes to the scouting program this year, only the oldest scouts move up in rank at this ceremony. 
The boys were treated to a magic show (very funny and entertaining).

Then they sang with Mr. M (the oldest boys' den leader)


There was lots of dancing during this song.

The different dens did a skit for the families, this is the senior weblos (Bug's den) doing their skit.


it was typical boy humor


The boys were given any awards they completed for the month. Here I missed making sure bug had everything done.  he needed a few more activities (which he did, but I did not mark down) and he would have gotten an award for doing all the weblo pins.

Then, the senior weblos "crossed over/bridged" to boys scouts. The parents were called up as part of the cermony

The boys were blind folded and led to the stage.


They took off their blind folds to symbolize that now they are responsible for moving themselves forward in boy scouts.

They recited the boy scout oath and law


And they received their arrow of light awards. This is the highest award in cub scouts.


The cub scout epaulets were removed, and the boy scout ones put on.  These showed that they are no longer cub scouts but are now Boy scouts.

They received their boy scout books and the ceremony was over.

All the boys are moving up to the same boy scout troop.  It is not usual that this happens in our pack, the boys usually scatter to many troops.  I am so grateful these boys will continue on in scouts together.  They are good friends and really push each other to be the best they can be.



Finally-
 
today, Chris is back.  He is working on mudding the seams of the shower area again.  he has managed to cover up a few of the color choices which means it will be easier to paint.

 
Well, that is all for today.
 
Love and hugs,
Deb

Tuesday, March 08, 2016

More of the bathroom remodel and Spring has Sprung

Little Man and I tried to take out the tile on Sunday, but we were stopped by CEMENT BOARD.  Mesh on both sides and concrete poured between- evil stuff, very evil. We could break the tiles, but could not break the board. My muscles really did not appreciate trying to break the cement board.



On Monday, the workers showed up and I had to put Pablo's harness on him.  He usually does not move once the harness is on him and he does not bark as much either.  Don't you feel sorry for our poor little Pablo???

This is Chris, the carpenter, taking out the shower.  He and Alex worked for about 90 minutes breaking up the tile and ripping out the cement board.  it was very loud.  I had to be on mute while they were working during my conference calls on Monday morning. 

After ripping out the tile, they had to break up the shower pan.  If I thought taking out the tile was loud, this was unbelievably noisy.  My head hurt from all the noisy.  I finally had to drop off my work conference call at one point.

We discovered some interesting things under the shower.  1. the smaller hole had been there all along. It was not the source of the leak, but it was interesting.  The larger hole was created when the drain cover was removed.
 
2. was the electrical outlet that had the back cut off.  Had the tile over the outlet failed, the shower could have been electrified. You can see it 2 pictures down from here.

Today, the workers were back and they installed the plumbing for the new shower controls and the shower head.

See that hole on the wall with the wire to it?  that is the electrical outlet in the kitchen.  You should not be able to see the light from the kitchen through it.  You can because there is no back on the electrical box and because I took the outlet cover off in the kitchen to replace the electrical box.  I did not complete it because I shocked myself- yes, I tried to replace the outlet with the electricity still on, I have done it before.  But in this case, in order to hold the outlet to take the screws out, I had to touch the outlet and I paid for it.

Tony and Chris working this morning.  Chris is putting up the board where the shower head will be installed.  there was on there originally, but it was damaged when they took out the tile and cement board yesterday.

Final picture of the day- the shower base is installed.  this has to sit for 24 hours before they can do anything else.  The workers will be back on Thursday to finish up.  On Wednesday afternoon/evening, I will replace the outlet box, we figured out which circuit breaker turns off the electricity for this outlet (and 4 other rooms in the house)

Saturday, we had dinner with friends- some yummy Lebanese food.  Chicken, tabouli and humus.

Monday, Little man, Pablo and I took a walk at the local park.  the daffodils, crocus and tulips are all coming up.  YEAHHHHHH



Little Man on his scooter. 


 
As we walked the park, I found the creek that Yutaro used to go to with a friend. 
 
Well that is all for today.
 
Deb

Saturday, March 05, 2016

bathroom demolition and other stuff

 
While this winter has been pretty warm, there has been a few days here and there where the temperatures were below 0 Celcius.  On those days, little man and I had to be bundled up at the bus stop.   I am very grateful that Spring is coming. Just a another few weeks.
 

Using the good china for dinner one night.

Another cold day at the bus stop- we even had some snow.

Pictures from the first game of the basketball tournament at the end of season.  This is warm ups, on Saturday 20Feb.


Last weekend, 27Feb, we went to the nature preserve near us because they were having maple sugar days.  They show us how maple syrup is made.  here, the sap from Maple tress is being boiled down.


Another vat of boiling maple sap.

Even Pablo got to go with us.

Little Man is learning how to tap the maple tree (in this case a stump). 


Pablo is sniffing the smells of the preserve.

The weather was nice enough that the turtle came up to son himself on a log.

February's picture of the boy and the dog walking in the preserve.

These guys are demonstrating how maple sap would be harvested back in the 1800s.  this is a small sugar shack.

Sap dripping into the bucket.

On 28Feb, we celebrated Auntie Lulu's birthday.


blowing out the candles.

today, 05Mar, Little man and I started the bathroom demolition.  Unfortunately, we did not get much more done than this.  The top part of the shower tiles were on regular drywall, but the bottom half is on cement board.  This means, we would have to punch through the cement board to get the tiles off.  We will have to let the plumbing team rip out the rest on Monday.  I think I might have to go work at the library on Monday, because it is going to be loud.

Using the sledge hammer




this is a piece of tile with the dry wall on it.  It is much thicker than I expected and we found some that clearly had dry wall mud (adhesive) dumped on the back to hold the tiles up.

taking out the soap dish.  this is all we were going to do on this wall.  this wall has all the water pipes in it and I did not want to risk hit/bursting a pipe.  Both bathrooms have pipes in this wall. 



 
We spent about 30 minutes busting out tile.  I am going to use the broken up tile to make garden stepping stones.  One way to recycle and reuse.
 
love and hugs,
Deb